PROJECTCOUNTRYDESCRIPTION
Darwendale PlatinumDesign of a trial open pit for extraction of a 2000 tonne platinum ore bulk sample to be sent for metallurgical testing.
Stump Section Geotechnical StudyGeotechnical study of the Stump Underground Section at Jena Mine to assess overall stability, assess the practicality of pillar extraction in the section and determine the optimum stope dimensions for the Stump Section
Mimosa Mine ClosureDevelopment of the Closure Plan, and conduct three early reviews and updates of the plan.
Rio Tinto - design and detailing of mine infrastructureZimbabweContracted to carry to carry out the design, detailing and scoping of mine infrastructure for a new gold mine.
Commissioned to undertake an Environmental Impact Study for the mining of the Darwendale trial open pit
Ascon Africa was commissioned by Ruschrome Mining to undertake an Environmental Impact Study for the mining of the Darwendale trial open pit. The purpose of the EIA was to identify potential environmental and social impacts arising from the project as well as their effective management to maximise benefits to the local communities and maintain sustainable use of natural resources.

Impacts Identification
The significant environmental and social impacts included:
• Disturbance to cultural heritage sites
• Visual impacts arising from mineral extraction and creation of waste dumps.
• Erosion
• Changes to hydrology and drainage networks

In order to ensure that environmental factors are considered during the implementation of this project an Environmental Management Programme was proposed under this.

Darwendale